Went to see the car last week.
What has been done so far:
1. The engine was overhauled and the 105's twin carburettors replaced.
2. Brake system was overhauled, master cylinder replaced and new calipers installed.
3. The regeneration of the mechanical subassemblies was carried out. The gearbox, front and rear engine mountings and steering system were checked for any defects and those that were found were duly replaced.
4. The engine was dip chromed including the air filter housing as well as some exterior badges.
Next up:
1. Aircond system being overhauled as we speak, with new aircond hose being installed and the radiator + condenser replaced.
2. Replace any old or deteriorated engine bay parts (like that water reservoir)
3. Replace damaged or worn out electrical wires including spark plug cables / Replace insulation conductors, wiring harness / Resolder old electric wiring ends.
4. New exhaust system.
5. New springs as the old ones are pretty soft.
6. New wipers.
7. Thorough cleaning of the car especially the engine bay and the interior - not to mention recondition of the car's leather seats.
8. Exterior detailing.
2. Replace any old or deteriorated engine bay parts (like that water reservoir)
3. Replace damaged or worn out electrical wires including spark plug cables / Replace insulation conductors, wiring harness / Resolder old electric wiring ends.
4. New exhaust system.
5. New springs as the old ones are pretty soft.
6. New wipers.
7. Thorough cleaning of the car especially the engine bay and the interior - not to mention recondition of the car's leather seats.
8. Exterior detailing.
No comments:
Post a Comment